Smart Metering – Turning an Obligation into an Opportunity
For grid operators and primary metering point operators, the rollout of smart metering systems is not an IT project, but a regulatory requirement with clear deadlines, high security standards, and significant implementation risks.
Netzkontor ensures that you implement this rollout nationwide in a structured, timely, and cost-effective manner—from the initial assessment to stable GWA operations.
What Is Smart Metering?
Smart metering systems consist of a modern metering device (mME) and a smart meter gateway (SMGW), which acts as a secure communication unit. They collect consumption data at short intervals, transmit it in encrypted form, and thus enable transparent and automated billing.
For grid operators and primary metering point operators (gMSB), their use is mandatory once certain thresholds are reached. The difference from conventional meters lies not only in the technology—it lies in the possibilities: dynamic rates, load control, feed-in management, and a significantly streamlined meter reading process.
What Netzkontor Does for You
- Rollout Planning & Strategy: Prioritizing installation requirements under the MsbG, resource planning, and developing a realistic rollout schedule—tailored to your network structure and device fleet.
- GWA Operation & Administration: Assumption of the Gateway Administrator (GWA) role, including firmware updates, certificate management, fault handling, and audit-proof logging.
- Process Integration & Market Communication: Integration with market communication systems (EDIFACT, MaKo 2020), coordination with SMGW manufacturers, and CLS management for controllable consumption devices in accordance with Section 14a of the Energy Industry Act (EnWG).
- IT Security & BSI Compliance Consulting on TR-03109 compliance, support with certification, and establishment of a documented information security management system in accordance with BSI requirements.
- Bidding & Equipment Procurement Market overview of approved SMGW manufacturers, guidance through procurement processes, and support in drafting contracts with equipment suppliers and installation partners.
- Training & Knowledge Transfer: Practical training for your employees in the areas of GWA operation, fault management, and regulatory requirements—available as in-person or online training.
The Legal Framework: What Network Operators Need to Know
Smart metering is not an optional upgrade—it is a legal requirement. The Metering Point Operations Act (MsbG) governs installation requirements, deadlines, and responsibilities. Anyone who misses deadlines risks penalties from the BNetzA.
- The MsbG defines obligations, deadlines, and the rollout sequence for gMSB and wMSB. Installation is mandatory for accounts with annual consumption of 6,000 kWh or more, or for EEG-compliant systems exceeding 7 kW.
- EnWG § 14a mandates the control of controllable consumption devices (heat pumps, charging stations, storage systems—over 4.2 kW) via the CLS channel of the SMGW. This requires a functioning GWA system.
- BSI TR-03109 Technical Guideline for SMGW certification, communication interfaces, and security requirements.
- MaKo 2020 / GPKE Market communication processes for metering points and meter data transmission in EDIFACT format.
- KRITIS / ISMS Critical Infrastructure Requirements for Network Operators Above Threshold Values; Information Security Management System Required.
Step by Step Toward Full-Scale iMSys Operations
A successful smart metering rollout is not a standalone project, but rather the coordinated implementation of regulatory requirements, IT, operations, and market communication. Without a clear structure, delays, inconsistencies, and operational risks can quickly arise. We ensure that all aspects of the project come together seamlessly.
- Assessment & Current State Analysis: Inventory of your meter fleet, IT systems, and existing processes. Identification of necessary actions based on MsbG installation requirements and the timeline.
- Concept & RFP Development of a customized rollout concept; support in selecting SMGW manufacturers and installation service providers.
- Pilot & System Integration: Installation of the first devices in a defined pilot area, integration into your system landscape (MDM, ERP, market communication), and acceptance testing of the interfaces.
- Rollout & GWA Operation: Mass installation according to a prioritized schedule, continuous GWA operation, monitoring, and troubleshooting during ongoing operations.
Frequently Asked Questions About Smart Metering
Who is required to install smart metering systems?
Under the MsbG, primary metering point operators (gMSB) are required to install smart metering systems for end users with an annual consumption exceeding 6,000 kWh, as well as for generation facilities with an installed capacity of 7 kWp or more. In addition, systems falling under Section 14a of the Energy Industry Act (EnWG) (e.g., heat pumps, wall boxes) are also to be gradually included.
Furthermore, newly installed, controllable consumption devices (heat pumps, wallboxes, storage units) with a capacity exceeding 4.2 kW must also be included under Section 14a of the EnWG.
What is a gateway administrator (GWA), and do I need an external service provider?
The GWA manages the technical aspects of the smart meter gateway—it manages certificates, installs firmware updates, and communicates with market participants. You can handle this task internally or outsource it. Many small and medium-sized grid operators opt for external GWA operation because the BSI requirements demand significant IT security expertise and 24/7 availability. Netzkontor can handle this function for you.
Which SMGW manufacturers are currently BSI-certified?
The BSI continuously updates the list of approved devices and manufacturers. Netzkontor assists you with the evaluation and selection process, as the choice of gateway has a significant impact on long-term costs, the range of functions (CLS, submetering), and the ability to integrate it into your existing system landscape.
How does smart metering relate to § 14a control of heat pumps and charging stations?
Section 14a of the German Energy Act (EnWG) requires grid operators to be able to dim controllable consumer devices in the low-voltage grid during grid congestion. The CLS (Controllable Local Systems) channel used for this purpose runs via the SMGW. A fully functional GWA is therefore the technical prerequisite for meeting this requirement at all. In addition, it is a metrological requirement for recording the reduction in grid charges.
How long does a typical rollout process take?
That depends heavily on the size of your meter fleet, the availability of installation contractors, and the maturity of your IT systems. For smaller service areas with a few thousand meter points, timeframes of 12 to 24 months are realistic—provided that preparation and system integration proceed in parallel. Netzkontor helps you develop a robust project plan.
Give us a call
The Direct Line
Would you like to speak directly with our sales team? Our key account managers will be happy to address your concerns.
Contact Form
Your Direct Line to Us
Do you have any questions, requests, or suggestions regarding our services? Please feel free to use our contact form to get in touch with us.